Krasnodar, 5 June. The reconstruction plans for this year in Krasnodar krai include three bridges, of which two have already been put into operation: the bridge over the Nevolka channel on the motor road between Vladimirskaya and Vesely villages in Labinsk rayon, and the most over the Bolshoe Pseushkho river on the road between Georgievskoe and Bolshoe Pseushkho villages in Tuapse rayon. Besides, the reconstruction of a 700 m long sector of the road between Vyselki and Kirpilskaya has reportedly been completed.
According to the regional Ministry for Transport and Road Facilities, road workers have proceeded to the construction of the new Yablonovsky Bridge over the Kuban River. The list of the current works performed in the context of the national project also includes a detour road around Leningradskaya and the reconstruction of a sector of the motor road between Krasnodar and Yeisk from the boundary between Dinskoi and Timashevsk rayons to Medvedovskaya. The Krasnodar, Sochi and Novorossiysk urban agglomerations are also taking part in the project. In Krasnodar, 13 projects have been completed, and the work is in progress on 43 other sites. In Sochi, the completion percentage is 79%; in Novorossiysk, the figure is 67%.
Follow our news on Facebook
За всеми важными новостями следите в MAX, Telegram, во «ВКонтакте», «Одноклассниках», YouTube и на Rutube