Krasnodar, 5 June – Yug Times. From June 15, repair works will begin at two Krasnodar bridges – Suvorovsky and Yablonovsky.

The Suvorovsky overpass will undergo a large-scale reconstruction in the context of the national project, Safe and High-Quality Motor Roads. The works include laying of a new asphalt covering, reinforcing of the load-carrying structures, replacing of the pavements and kerbs.

“While planning the repair works, we bear in mind that [this bridge] is an entry to the city from the south, with quite a heavy traffic,” Vladimir Arkhipov, director of the city Department for Transport and Road Facilities, said. “But the repair is a long-felt need – we need to reinforce the load-carrying structures and to replace the roadbed.”

The traffic along the Suvorovsky bridge will be limited during the repair works.

As for the Yablonovsky bridge, the repairers will install three-metrehigh metal clearance gauges on the both ends of the bridge to restrict the height of the vehicles passing it. The new traffic mode will be enacted in July.


Follow our news on Facebook

За всеми важными новостями следите в MAX, Telegram, во «ВКонтакте», «Одноклассниках», YouTube и на  Rutube